Repair of a section of 705 street from the Mega Mall junction to the entrance to the Hydrobeton concrete junction

  • Excavation;
  • Building an embankment for road construction;
  • Milling of asphalt pavement of different thickness;
  • Repair of damaged areas and deformations in the asphalt pavement;
  • Preparation, organization and logistics;
  • Delivery and laying of all types of asphalt;
  • Construction of drainage facilities;